Need advice? We like to think along with you:

Request quote
  1. More than 25 years of experience
  2. Extensive offer
  3. Personal service and advice
  4. Brand Independent
  5. Customization for every issue
Espa Silen S 75-15M 230VEspa Silen S 75-15M 230V
Espa Silen S 75-15M 230V
Espa Silen S 75-15M 230V

Espa Silen S 75-15M 230V

Art ID00800088
DescriptionEspa Silen S 75-15M 230V
In stock
Delivery time 4 business days
Price excluding taxes€546,00
Price incl. VAT€660,66
€660,66
(Incl. btw)
Amount

Out of stock, please contact us. Delivery time 5 days.

Characteristics

Article number00800088
MerkEspa
Capaciteit14 m3/h @ 8 mwk
Voltage1x230V
Frequentie50 Hz
UitvoeringZelfaanzuigend
Max. opvoerhoogte in MWK15
Max. debiet in m3/uur17
Capaciteit in m3/h bij 10 MWK13
Artikelnummer fabrikant203148
Type / ModelSilen S
Vermogen in kilowatt0,55

Description

The Silen series from Espa is a series of self-priming, plastic pumps and are designed for pool applications. These pumps are extremely suitable for continuous pumping of liquids with dissolved chemicals. The pumps are provided with a filter for coarse particles and is built to a pump case. The pumps are suitable in situations when big amounts have to be pumped en for the use in ponds and streams. Available in one-phase and three-pase version.

[b]Application/b]

  • Pools Zwembaden
  • Water with chemical elements
  • High flow installations
  • Recycling of water with chlorine mixtures
  • Garden sprinkling
  • Ponds and streams
Suitable for clean and lightly polluted liquids.

PDF download click here for technical specifications.

also look at