Jung sewage lifting station Compli 1015/4 BW
Art ID | 03000040 |
---|---|
Description | Jung sewage lifting station Compli 1015/4 BW |
In stock | |
Delivery time | 5 business days |
Price | On request |
Out of stock, please contact us. Delivery time 5 days.
Characteristics
Article number | 03000040 |
---|---|
Merk | Pentair |
Voltage | 3x400V |
Frequentie | 50 Hz |
Max. opvoerhoogte in MWK | 8 |
Max. debiet in m3/uur | 69 |
Artikelnummer fabrikant | JP09830 |
Doorlaat in mm | 70 |
Aansluiting | DN 80 |
Type / Model | Compli 1000 |
Materiaal pompdeel | Gietijzer |
Kabellengte in meters | 4 |
Vermogen in kilowatt | 1,70 |
Geleverd met vlotter | Ja |
Materiaal waaier | Gietijzer |
Waaier type | Vortex |
Description
Jung Compli 1015/4 BW
Sewage lifting station
Motor: 1,7kW 3x400V 50Hz
Capacity: 19-69m³/h @ 8-1mWk
Free passage: 70mm
Connection: DN80
Including: 4 meter cable
With their performance graduations, the compli 1000 disposal units have been designed for use in detached houses, in several residential units or in commercial buildings. During the design work, special attention was given to easy handling, space-saving erection and uncomplicated installation.
The submersible unit is permitted for general use in areas subject to flooding. The control unit has to be fitted in a well ventilated flood-proof room.
The PE tank has freely accessible drains, a cleaning opening at the top and and a clamp-type inlet flange for an installation. The inlet height can be variegated according to the feeding pipe:
• DN 100: 180-205 mm (left), 250-300 mm
(center) and 290-340 mm (right), each
continuously adjustable
• DN 150/DN 50: 180 mm (left), 275 mm
(center) and 315 mm (right)
For the connection of a DN 100 feeding pipe a reducer DN 150/100 is enclosed. The tank has vertical inlet in DN 150 or DN 100. If not in use, the rear inlet must be closed with the plug set DN 150 (accessory).
The vortex impeller of the pump offers the safety you can rely on. Duplex systems have two pump units on one tank which are switched alternately or, if and when required, they are operated both in order to cope with peak load or reserve operation.
PDF download click here for technical specifications.